Hallo Zusammen,
wie kann ich die o. g. Umstellung vornehmen?
Hi, In principle it should work around these lines:
1. Buy an external temperature sensor (for the boiler you have);
2. Connect it to the boiler (see manual on connection and location of the sensor);
3. Rerun the commisioning phase of the boiler and make the appropriate choices.
All the best
| Benutzer | Anzahl |
|---|---|
| 19 | |
| 13 | |
| 8 | |
| 8 | |
| 5 |